The Playbook

Eight questions that keep us clear

53 minute readDownload the PDF

TJP is an independent educational curriculum designed for use in South Carolina correctional settings. References to SCDC describe the setting it was designed for and the governance it proposes. It is not an official SCDC publication.

On this page (20 sections)
  1. Part 1: Why a Playbook?
  2. Part 2: Where This Comes From: Lencioni's Six Questions
  3. Part 3: The TJP Translation: Eight Questions
  4. Part 4: The Eight Questions, One at a Time
  5. Part 5: Project Pages: The Playbook in Miniature
  6. Part 6: How the Playbook Lives in the Meeting Rhythm
  7. Part 7: The Clarity Check
  8. Part 8: What Could Go Wrong
  9. Part 9: Why TJP Must Exist
  10. Part 10: Signage for the Dorm, the Think Tank, and the Task Force
  11. Part 11: Getting Started: The First 30 Days
  12. Worksheet 1: The Eight Questions Master Sheet
  13. Worksheet 2: Core Behaviors
  14. Worksheet 3: The One Big Thing
  15. Worksheet 4: Who Does What by When
  16. Worksheet 5: Project Page Template
  17. Worksheet 6: The Clarity Check
  18. Worksheet 7: Playbook Change Request
  19. Further Study
  20. Sources

Part 1: Why a Playbook?

TJP is full of talented people. Our risk is not a lack of intelligence or effort. Our risk is that thirty good people pull in thirty slightly different directions, and nobody notices until a pilot fails, a partner gets a confusing message, or a leadership level hears two different stories about what we are doing.

The TJP Playbook solves that problem in the plainest way possible: it writes down, in short sentences, the answers to eight questions, and then it makes sure those answers are read, used, checked, and improved at every meeting.

Here is how the football picture maps onto TJP:

Football TJP Where it happens
Plays designed off the field Playbook answers drafted and revised Strategic meeting and Horizon Review
Play called in the huddle Today's One Big Thing and commitments read aloud Check-In
Play run on the field Research, build, pilot, deliver Think Tank and Task Force
Film review 3 Ws debrief, PROOF results, ADOPT verdicts Tactical meeting
Coaches and league officials Three levels of leadership Committee, Board, SCDC Division

What the Playbook is, and what it is not

The Playbook IS The Playbook is NOT
Eight short answers everyone can say from memory A policy manual or a rulebook
The written result of our meetings Something one person writes alone
Changed on purpose, with a log Changed quietly by whoever has the file open
Approved at the right leadership level Voted on by residents alone
A few pages, plus one page per project A thick binder nobody reads
Posted on the wall in plain words Locked on a computer

Part 2: Where This Comes From: Lencioni's Six Questions

Patrick Lencioni is a writer and consultant who has spent his career studying why some teams work and others do not. In The Advantage (2012), he argues that the biggest advantage any organization can have is not smarts but health: less confusion, less politics, higher morale, lower turnover. He says an organization gets healthy through four disciplines:

Discipline Plain words TJP version
1. Build a cohesive leadership team The people in charge trust each other and argue honestly TRUST rules, the three leadership levels working together
2. Create clarity Agree on the answers to the big questions The Eight Questions
3. Overcommunicate clarity Say the answers again and again Signage, Check-Ins, the Monthly Report
4. Reinforce clarity Build the answers into how things run The Meeting Rhythm, Project Pages, orientation

The heart of "create clarity" is six questions Lencioni says every leadership team must answer together, with no daylight between them:

# Lencioni's question What he calls the answer
1 Why do we exist? Core purpose
2 How do we behave? Core values
3 What do we do? Business definition
4 How will we succeed? Strategy (he uses a few "strategic anchors")
5 What is most important, right now? Thematic goal (a single rallying cry for a season)
6 Who must do what? Roles and responsibilities

Lencioni puts the answers on a short document he calls a playbook, and he tells leaders to become their organization's "chief reminding officers," repeating the answers until people roll their eyes, and then repeating them again. He is right about that. People do not remember what they heard once. They remember what they hear every week.

What Lencioni gets right for us

  • Clarity beats cleverness. A room full of brilliant people who disagree about the goal will lose to an average team that agrees.
  • One goal per season. His "thematic goal" is one rallying cry for a stretch of roughly three to twelve months. Everything else is either supporting that goal or keeping the lights on.
  • Values must be real. He warns against "values" that are just nice words on a wall. A real value is one you would keep even if it cost you something.
  • Repetition is not weakness. Saying the same thing forty times is the job, not a failure.

Where Lencioni's language gets in our way

TJP leadership named it: the language is "too business-y." Words like business definition, strategic anchors, thematic goal, standard operating objectives are useful to consultants and executives. They are not how intelligent people who never sat in a boardroom talk. And TJP is going to be explaining itself to residents, families, youth, pastors, judges, and legislators. Plain words travel further.

Lencioni's term TJP plain words
Core purpose Why we are here
Core values How we treat each other (core behaviors)
Business definition What we actually do
Strategic anchors How we win: our three anchors
Thematic goal The One Big Thing
Defining objectives Supporting goals (the three or four pieces of the One Big Thing)
Standard operating objectives Standing responsibilities (things we always do, every season)
Roles and responsibilities Who does what, by when

Part 3: The TJP Translation: Eight Questions

# TJP question (plain words) What the answer is called Memory word
1 Why are we here? Purpose WHY
2 How do we treat each other? Core behaviors HOW
3 What do we actually do? The work WHAT
4 Who are we doing it for? [added] The people we serve WHOM
5 How will we win? Our three anchors WIN
6 What matters most right now? The One Big Thing NOW
7 Who does what, by when? Roles and commitments WHO
8 How will we know it worked? [added] Proof KNOW

The memory chant: Why, How, What, Whom. Win, Now, Who, Know. Two lines of four words. The first line is who we are and do not change often. The second line is how we play this season and changes more often.

Why we added Question 4: Who are we doing it for?

In a business, the customer is the one who pays. Everybody knows who that is. In TJP, nobody pays, and almost everybody is a possible audience: residents, officers, families, youth, victims, churches, courts, the legislature, "the community." That sounds generous. In practice it is a trap.

The ADOPT doctrine already says it: build for one named real person, not "the public." A project that serves "the public" serves no one, because you cannot test it, you cannot tell if it worked, and you cannot fix it. "The public" cannot tell you the workshop was confusing. A fifteen-year-old named in your plan (with privacy protected) can.

Question 4 forces every level of TJP, from the whole program down to a single ADOPT project, to say out loud who the work is for, and who it is not for. The second half matters just as much. Saying "not for victims directly, unless a licensed therapist invites it" is how we keep people safe.

Why we added Question 8: How will we know it worked?

W. Edwards Deming, the quality expert whose ideas rebuilt Japanese manufacturing after World War II and later reshaped American industry and health care, taught that you cannot improve what you have not defined and measured. His Plan, Do, Study, Act cycle only works if the "Study" step has something to study.

Lencioni's six questions assume a business will notice success because money comes in. TJP will not have that signal. We could run for five years, feel good, and have no idea whether a single person was safer. Question 8 makes proof part of clarity, not an afterthought. Every answer to Question 8 points to a PROOF line: Problem Number, Result Number, Observer, On this date, Fail Line. Written before we build. Always.

Part 4: The Eight Questions, One at a Time

Each question below follows the same pattern: plain meaning, why it matters, how to answer it well, a bad answer and a good answer, TJP's draft answer, and who can change the answer.

How authority works in the Playbook

Before the questions, one table. TJP is not a resident-led initiative. Three levels of leadership provide oversight, direction, and supervision. Residents do the work and are expected to think hard, speak up, and propose improvements. The levels below decide.

Level Role in TJP Role in the Playbook
SCDC Division of Programs, Reentry, and Rehabilitative Services Oversight Informed of every approved change through the Monthly Report; any change touching agency policy goes to them first
Board of Volunteers Direction: trustees of the vision and mission, guardians of program integrity Guards Q1 and Q2. Approves any change to purpose or core behaviors. Consulted on Q3 and Q4.
Interdepartmental Committee (Associate Warden for Programs, Programs Supervisor, Chaplains, Education Leader) Supervision Approves changes to Q5, Q6, Q7. Approves Q3, Q4, and Q8 changes after consulting the Board where noted.
TJP residents Do the work Propose changes using the Playbook Change Request (Worksheet 7), draft Project Pages, keep commitments

Question 1: Why are we here? (Purpose)

Plain meaning. The reason TJP exists. Not what we do, but why it is worth doing at all. If TJP disappeared tomorrow, what would South Carolina lose?

Why it matters. Purpose is the anchor when things get hard. When a pilot flops, when a cohort loses members to transfers, when a partner says no, the purpose is what keeps people from quitting or drifting into side projects. It also protects the program from being bent into something it is not. A strong purpose statement lets any person say, "That is a good idea, but it is not why we are here."

How to answer it well.

  • Keep it short enough to say in one breath (the LESS filter applies).
  • Aim it outward. Purpose is about what changes in the world, not about us.
  • Make it true in ten years. Purpose should not change when the season changes.
  • Do not stuff it with activities. Activities belong in Question 3.
Bad answer Good answer
"To provide high-quality, evidence-based, trauma-informed programming that empowers participants to reach their full potential." "TJP reframes the narrative of harm, healing, and prevention."
Why it fails: It is a list of nice words. It is about us, not the world. Nobody will remember it by lunch. Why it works: Short, outward, true for decades, and it tells you what we are trying to change: the story South Carolina tells itself about harm.

TJP draft answer (Q1).

Our vision: TJP reframes the narrative of harm, healing, and prevention.

Our mission: To implement the principles and practices of Transformative Justice across all sectors of South Carolina.

In our own words: We are here because the old story says harm is only about punishment. We believe harm can be understood, healed, and prevented, and that people who caused harm can help prevent the next harm. We exist so that fewer people in South Carolina get hurt.

Who can change it. The Board of Volunteers only. Residents and staff may propose wording changes through a Change Request, which the Interdepartmental Committee forwards to the Board with its recommendation. The SCDC Division is informed. Expect this answer to change rarely, if ever.

Question 2: How do we treat each other? (Core behaviors)

Plain meaning. The few ways of acting that are non-negotiable in TJP, whether anyone is watching or not. Lencioni calls these core values. We call them core behaviors, because a value you cannot see in behavior is just a slogan.

Why it matters. A transformative justice program that does not practice what it teaches will teach the opposite. Residents, officers, and visitors watch what we do far more closely than they listen to what we say. Core behaviors also make hard moments easier: when a disagreement gets hot, anyone can point to the wall and say, "Rank the idea, not the person," and the room resets.

How to answer it well. Lencioni describes four kinds of values, and knowing the difference prevents a lot of confusion:

Kind Plain meaning TJP example
Core Who we truly are; we would keep it even if it cost us TRUST behaviors
Permission to play The minimum to be here at all; not special, just required Safety, SCDC rules, confidentiality
Aspirational What we want to become but are not yet "Every resident teaches someone else"
Accidental Habits that crept in, good or bad, that nobody chose "Only the loudest speak in Tactical"

A good Q2 answer names the core behaviors, lists permission-to-play rules separately, and is honest about what is still aspirational. It describes behavior you could see on a video.

Bad answer Good answer
"Respect, integrity, excellence, accountability, compassion." "Tell it early. Rank the idea, not the person. Unfinished is allowed. Say it in the room. Take the task."
Why it fails: Five abstract nouns. Every organization on earth claims them. Nobody can tell whether you did "integrity" in a meeting on Tuesday. Why it works: Five actions you could catch on camera. Each one can be kept or broken in a single meeting.

TJP draft answer (Q2): the TRUST behaviors. These come straight from the ADOPT workshop, turned into behaviors we hold for the whole program.

Letter Core behavior What it looks like What breaking it looks like
T Tell it early You raise a problem the day you see it, while it is small "I knew last week the printer was down but didn't want to say"
R Rank the idea, not the person You argue about the plan, not about who proposed it "Of course he'd suggest that"
U Unfinished is allowed You bring drafts before they are polished so others can help Hiding work until it is "perfect," then missing the date
S Say it in the room Disagreement is spoken in the meeting, not in the dayroom afterward Nodding in the meeting, then running it down at chow
T Take the task Every decision ends with a name and a date, and you volunteer "Somebody should..." with no somebody

Permission-to-play rules (required, not special):

  1. Safety and SCDC policy come first, always.
  2. What is shared in a session stays in the session, unless safety requires otherwise.
  3. Peer facilitators are educators, never therapists. Trauma sessions are always led by staff.
  4. No one's story is used without their consent and the proper review.
  5. Equipment and space are cared for as if they belonged to the next cohort, because they do.

Aspirational (be honest, we are not there yet): "Every TJP resident can teach one thing they learned to someone who was not in the room."

Who can change it. The Board of Volunteers approves any change to the core behaviors. The Interdepartmental Committee may add or clarify permission-to-play rules, since those follow institutional policy, and informs the Board. Residents propose.

Question 3: What do we actually do? (The work)

Plain meaning. A plain description of our activities, the kind you would give a family member on the phone in thirty seconds. Lencioni calls this the business definition. It is the least exciting question and the one most often answered badly.

Why it matters. If you cannot say what you do, partners cannot help you, leadership cannot defend you, and new residents join expecting something else. It also draws a fence: work outside the fence is not TJP work, even if it is good work.

How to answer it well.

  • Use verbs. "We study, build, test, and teach."
  • Name the setting and the method, not the dream.
  • Draw the fence: say what we do not do.
Bad answer Good answer
"We transform lives through holistic, innovative approaches to justice." "We study the science of harm and healing, build tools with the ADOPT process, test them with real audiences, and deliver the ones that work."
Why it fails: Nobody could picture a single hour of the day. Why it works: You can picture it. You can check whether it happened this week.

TJP draft answer (Q3).

TJP residents move together, as a cohort, through 13 ten-week courses on the science of harm, healing, and prevention (about 2.5 years), after an orientation where each resident writes The Personal Narrative.

In each course we research in the Think Tank (weeks 1 to 6), build and pilot a real tool in the Task Force (weeks 7 to 9) using the ADOPT process, and deliver and publish it (week 10).

We deliver through Four Channels: training other incarcerated people, written materials, live visitors, and recordings (introduced in that order: 4, 1, 3, 2).

Residents then co-facilitate courses and complete the Keystone: a ten-week team project that produces a deployable intervention package for one real, bounded South Carolina harm, scored by an outside panel and tracked for adoption.

What we do not do: We do not provide therapy. We do not contact people harmed by residents except through proper, therapist-guided channels. We do not operate outside SCDC policy or without leadership approval.

Who can change it. The Interdepartmental Committee approves changes, after consulting the Board of Volunteers, since changes to the work can change the mission. Changes to the course sequence or structure also go to the SCDC Division if they affect agency programming approvals. Revisited at the Horizon Review.

Question 4: Who are we doing it for? (The people we serve) [added]

Plain meaning. The specific people whose lives should be different because TJP exists. Not "society." Real groups, and, at the project level, one named real person.

Why it matters. This is the question that keeps us honest. A tool built "for everyone" is usually built for the builder. When you name who it is for, you have to go ask them, test with them, and accept their verdict. It also protects people: naming who the work is not for (for example, people harmed by a resident's own crime, unless a licensed therapist deems it appropriate) prevents well-meant damage.

How to answer it well.

  • List groups in order of priority, and be honest that the first group served is often ourselves.
  • For each group, say what should be different for them.
  • Name who it is not for, or not yet for.
  • At the project level, name one real person (with privacy protected: a first name, a role, or a description the team agrees on).
Bad answer Good answer
"The community." "Youth ages 12 to 17 in [named county] referred to a diversion program, and specifically 'Marcus,' age 14, the kid our team member used to be."
Why it fails: You cannot test anything with "the community." You cannot call it on the phone. Why it works: You can design for Marcus, test with kids like Marcus, and ask Marcus's mentor whether it helped.

TJP draft answer (Q4).

Priority Who What should be different for them
1 TJP residents They understand the harm they caused and experienced, practice new behavior, and become credible teachers
2 The people residents live near now: other residents, officers, staff, and the dorm Fewer conflicts, safer units, more people learning from peers (Channel 4)
3 Families and children of residents Better contact, honest repair where appropriate, a different story at home
4 People at the forks in the road: at-risk youth before the juvenile system, young adults, people in early addiction They meet a credible messenger and a real tool before harm happens
5 People harmed, including those not harmed by our residents Access to narratives and tools that may support healing, offered only when their own therapist deems it appropriate
6 The people who can adopt our work: schools, churches, courts, reentry and recovery programs, law enforcement, the Department of Mental Health Ready-to-use, tested tools they can put to work without us in the room

Not for (or not yet): We do not design for "the public" in general. We do not deliver directly to people harmed without a licensed professional deciding it is appropriate. We do not serve audiences outside SCDC approval.

Who can change it. The Interdepartmental Committee approves changes after consulting the Board of Volunteers. Any change that adds a new group involving minors or people harmed also goes to the SCDC Division. Revisited at the Horizon Review.

Question 5: How will we win? (Our three anchors)

Plain meaning. What makes TJP different from every other program, and the few choices we will keep making because of it. Lencioni calls these "strategic anchors": usually about three things that guide every decision. "Win" does not mean beating another program. It means succeeding at our purpose.

Why it matters. Without anchors, every decision starts from zero, and the loudest idea wins. With anchors, you can take a new proposal and ask, "Does this fit our three anchors?" and most decisions make themselves. Anchors also give partners a reason to choose us.

How to answer it well.

  • Three anchors is usually right. Two is too thin; six is a wish list.
  • Each anchor should be something a competitor could not easily copy.
  • Each anchor should help you say no to something.
Bad answer Good answer
"By working hard, staying positive, and being the best." "Close, Checked, Carried: we are close to the harm, we check our work with numbers, and we build things others can carry out without us."
Why it fails: Every team says this. It helps you say no to nothing. Why it works: Each anchor rules things out. A tool with no PROOF line fails "Checked." A tool only we can run fails "Carried."

TJP draft answer (Q5): The Three Cs.

Anchor What it means What it helps us say no to
CLOSE Our work is built by people close to harm: residents who have lived it (credible messengers), under professional supervision, grounded in serious science from the 13 courses Tools designed from a distance with no lived knowledge, and tools with lived knowledge but no science or supervision
CHECKED Nothing gets built until the numbers are written down. Every project has a PROOF line, a pilot, silent scoring, and a verdict "It felt good" as evidence. Launching without a Fail Line
CARRIED We build for adoption: stranger-proof, small enough to carry, with a two-page adoption package, tracked in the Adoption Register Tools that only work when a TJP resident is in the room. Beautiful binders nobody uses

The one-breath version: We are close to the harm, we check our work, and we build what others can carry.

Who can change it. The Interdepartmental Committee approves changes, and informs the Board of Volunteers (the Board may ask to review any anchor it believes affects the mission). Revised at Strategic meetings when evidence says an anchor is not working.

Question 6: What matters most right now? (The One Big Thing)

Plain meaning. The single most important goal for this season, usually six to twelve months. Lencioni calls it the thematic goal: one rallying cry that everyone shares. We call it the One Big Thing.

Why it matters. When everything is a priority, nothing is. A new program especially will be pulled toward a hundred good ideas: a podcast, a youth summit, a book, a partnership with every church in the county. The One Big Thing is permission to say "not this season" to good ideas so the most important idea gets done.

How to answer it well. Lencioni's structure has three layers, and we keep all three:

Layer Lencioni's term TJP term What it is
Top Thematic goal One Big Thing One rallying cry, one season, shared by everyone
Middle Defining objectives Supporting goals Three to five temporary pieces that together make the One Big Thing true
Bottom Standard operating objectives Standing responsibilities Ongoing duties that never go away, whatever the season

Rules for a good One Big Thing:

  • One. Not two. Not "one with a sub-bullet that is really a second goal."
  • A season. It has a start and an end date, roughly six to twelve months.
  • Shared. Everyone, including staff and leadership, can say it.
  • Qualitative, then measured. The One Big Thing is stated in plain words; its supporting goals carry the numbers through Question 8.
Bad answer Good answer
"Grow the program, improve outcomes, build partnerships, launch the podcast, and plan the summit." "Launch Cohort A and prove the model."
Why it fails: Five goals. Everyone will pick their favorite. Why it works: One sentence. Everyone knows what winning this season looks like.

TJP draft answer (Q6): First season.

ONE BIG THING (Season 1, roughly the first 9 to 12 months): Launch Cohort A and prove the model.

Supporting goal What done looks like Ties to Q8
1. Welcome Cohort A well 12 to 15 residents complete orientation; every resident finishes a Personal Narrative draft reviewed through the proper process Orientation completion; baseline instruments given in week 1
2. Run the first courses cleanly Courses 11 and 9 (and Course 1 if the calendar allows) run all ten weeks, in the order set by the Cohort Rotation Plan, with every Task Force build using ADOPT Attendance, session fidelity checks, ADOPT verdicts recorded
3. Prove one channel works At least one Channel 4 delivery (residents teaching other residents) is piloted with a PROOF line and a verdict PROOF line result vs Fail Line
4. Stand up the backbone The Meeting Rhythm runs on schedule; the TJP Evidence Workbook is set up; every Monthly Report goes out on time Meetings held, reports delivered, data entered

Standing responsibilities (every season):

  • Keep every activity inside SCDC policy and institutional security requirements.
  • Protect confidentiality and clinical boundaries.
  • Deliver the TJP Monthly Report on time to all three leadership levels.
  • Enter evidence into the TJP Evidence Workbook weekly.
  • Care for the Think Tank, the Task Force, and all equipment.
  • Keep the Playbook current and posted.

Who can change it. The Interdepartmental Committee approves the One Big Thing, its supporting goals, and any mid-season change, and informs the Board of Volunteers. The SCDC Division sees it in every Monthly Report. Residents draft proposals for the next season's One Big Thing at the last Strategic meeting of the season.

Question 7: Who does what, by when? (Roles and commitments)

Plain meaning. Who is responsible for each piece of work, and the date it is due. Lencioni's version is "Who must do what?" We add "by when" because a task without a date is a wish.

Why it matters. Most failures inside good teams are not failures of effort. They are failures of ownership: two people each thought the other had it, or nobody did. Question 7 is where the TRUST behavior "Take the task" becomes real.

How to answer it well. Question 7 has two parts:

  1. Standing roles that stay the same for a season (who facilitates Tactical, who keeps the Decision Log, who manages the Evidence Workbook).
  2. Commitments that come out of each meeting: one task, one owner, one date, one way to tell it is done.

A good commitment passes the one-name, one-date, one-proof test.

Bad answer Good answer
"The Task Force team will handle outreach materials soon." "D. Jones drafts the one-page youth handout and brings it to Tactical on Oct 14. Done = printed draft on the table."
Why it fails: Nobody owns it. "Soon" never arrives. Why it works: One name, one date, one thing you can hold in your hand.

TJP draft answer (Q7): Standing roles for Season 1. Names are filled in by the Interdepartmental Committee. Roles marked "staff" must be held by staff or leadership, not residents.

Role Held by Main duties
Program lead (staff) Named by the Interdepartmental Committee Final say on daily operations; signs off on Monthly Report
Playbook keeper A resident, supervised by the Programs Supervisor Keeps the master Playbook file and posted copies current; runs the change log
Decision Log keeper A resident, rotates each season Records every decision and commitment in Tactical and Strategic meetings
Meeting facilitators Trained residents and staff Run Check-Ins, Tacticals, and Strategics using the Meeting Rhythm
Evidence Workbook lead A resident, supervised by staff Enters and checks data weekly; prepares numbers for the Monthly Report
Course facilitators Half peer, half staff; trauma sessions always staff Teach each course; peer facilitators are educators, never therapists
Project leads One resident per ADOPT project Owns the Project Page and the PROOF line
Clinical and safety reviewer (staff) Licensed or designated staff Reviews any trauma-adjacent content, Personal Narrative use, and outside audiences

Commitments are tracked on Worksheet 4 (Who Does What by When) and reviewed at every Tactical.

Who can change it. The Interdepartmental Committee approves standing roles. Commitments are set in Tactical meetings by the people doing the work, with the staff facilitator confirming. Changes that affect staff duties are decided by the Committee alone.

Question 8: How will we know it worked? (Proof) [added]

Plain meaning. The evidence that tells us whether we are succeeding, written down before we start, including the number that would tell us we failed.

Why it matters. Deming spent his life showing that good people inside a bad system produce bad results, and that you cannot tell a good system from a bad one without measuring it. TJP will be judged by people who have seen many programs promise change. Honest proof, including honest failures, is what will earn their trust. It is also how we get better: Tactical meetings can only fix what they can see.

How to answer it well.

  • Write it first. Nobody builds until the numbers are written down.
  • Use the PROOF line for every project and every supporting goal.
  • Use the three measurement layers for the program as a whole.
  • Pass the two-counter test: if two people counted, would they get the same number?
  • Name the Fail Line and mean it.

The PROOF line (reminder):

Letter Part Question it answers
P Problem Number What is the number now? (baseline, go count it)
R Result Number What number counts as a win?
O Observer Who checks, from outside the team?
O On this date When do we count?
F Fail Line What number means this did not work?
Bad answer Good answer
"We'll know it worked when we see lives changed." "Problem: 3 of 15 residents can name the four parts of an NVC request. Result: 11 of 15. Observer: Education Leader. On: week 10. Fail Line: fewer than 7."
Why it fails: Nobody can count "lives changed." Any result can be called a success. Why it works: Two people counting would get the same number, and a miss is visible.

TJP draft answer (Q8).

We will know TJP is working through three layers of evidence, kept in the TJP Evidence Workbook and reported monthly:

  1. Validated instruments: given at baseline (week 1), post (week 10), and a 6-month retention check.
  2. Behavioral markers: attendance, disciplinary trends, peer teaching, and other observable behavior, defined with the TJP Evidence System.
  3. Product artifacts: every tool built, every PROOF line, every ADOPT verdict, and every adoption tracked in the Adoption Register at 6, 12, 24, and 36 months.

Season 1 proof: each supporting goal of the One Big Thing carries its own PROOF line, drafted at the first Strategic meeting of the season and approved by the Interdepartmental Committee.

Honesty rule: a documented ABANDON verdict is a success of the process. We report misses as plainly as wins.

Who can change it. The Interdepartmental Committee approves program-level measures, after consulting the Board of Volunteers and, where research partners are involved, following their review requirements. Project-level PROOF lines are drafted by residents and approved by the staff facilitator before the build begins. Once a PROOF line is approved, the Result Number and Fail Line are not changed after the pilot. Changing the target after you see the score is not measurement; it is storytelling.

Part 5: Project Pages: The Playbook in Miniature

Every ADOPT project, from a three-week Task Force build inside a course to a ten-week Keystone, gets one page in the Playbook. The Project Page answers a project-sized version of the Eight Questions, holds the PROOF line, and shows where the project is in the ADOPT steps and what the verdict was.

Why one page

  • It forces clarity. If you cannot fit it on one page, you do not yet know what you are doing.
  • It travels. One page can be read in a Tactical, attached to a Monthly Report, and handed to a partner.
  • It builds a library. After 13 courses, Cohort A alone will have produced a shelf of Project Pages. Cohort B starts on the shoulders of Cohort A.

The eight questions at project size

Program question Project-size version
1. Why are we here? Why does this project exist? What harm or need does it address?
2. How do we treat each other? Our team's TRUST charter signed? Any extra team rules?
3. What do we actually do? What exactly are we building? (one sentence)
4. Who are we doing it for? One named real person, and who it is not for
5. How will we win? Which of the Three Cs does this project show most strongly?
6. What matters most right now? The current ADOPT step and the one thing due next
7. Who does what, by when? Team members, roles, and the next three commitments
8. How will we know it worked? The PROOF line, the pilot result, and the verdict

The blank template is Worksheet 5. Below is a fully filled example.

Example Project Page: "Say It as a Request"

This is a training example. The team, numbers, and dates are illustrative, not real results.

Field Entry
Project name Say It as a Request: a live NVC workshop for a visiting youth group
Course Course 11, Acts of Violence Are Failed Requests (Rosenberg, NVC)
Space and phase Task Force, weeks 7 to 9; delivered week 10
Channel Channel 3: Live visitors
Project lead Resident "R.M."
Staff sponsor Course staff facilitator; Chaplain for visitor coordination
Playbook version Written under Playbook v1.0

Q1. Why does this project exist? Many fights between teenagers start as a need nobody could name: respect, safety, belonging. The youth hear demands and threats where there was a request underneath. We want them to hear the request.

Q2. How will we treat each other? TRUST charter signed by all four team members on week 7. Extra team rule: nobody tells their own case story to the youth unless staff approved it in advance.

Q3. What exactly are we building? A 45-minute live workshop where four residents teach the four NVC steps (observation, feeling, need, request) using three role-plays drawn from school situations, plus a pocket card the youth keep.

Q4. Who is it for? One named real person: "Jay," 15, a composite built from the team's own memories of who they were at that age and checked with the visiting group's youth leader. Jay is quick to anger, smart, and hates being lectured. Not for: youth in crisis, or as a substitute for counseling. The visiting group's own adult leaders remain responsible for their youth at all times.

Q5. Which anchor does it show? CLOSE most strongly (credible messengers who were once Jay), with CARRIED built in: the pocket card and a two-page leader guide let the youth leader repeat the lesson without us.

Q6. Current step and next thing due. ADOPT step: T (Try, Test, Tune): complete. Verdict recorded. Next thing due: submit revised leader guide to staff sponsor by week 10, day 3.

Q7. Team and commitments.

Who Role Commitment By when
R.M. Project lead, opener Revised pocket card (one change only) Week 10, Mon
T.B. Role-play lead Rewrite role-play 2 per 3 Ws Week 10, Mon
D.W. Recorder Enter scores into the Evidence Workbook Week 9, Fri
K.L. Leader-guide writer Two-page leader guide to staff sponsor Week 10, Wed

Q8. PROOF line (written week 7, before building).

Part Entry
Problem Number On a 4-item "turn it into a request" card given at the start, the group averages 1 of 4 correct (counted by the youth leader during the pre-visit session)
Result Number Group average of 3 of 4 correct on the same card at the end of the workshop
Observer The visiting group's youth leader, with the staff facilitator as second counter
On this date The day of the workshop, scored the same afternoon
Fail Line Group average below 2 of 4 means the workshop did not work

ADOPT step status

Step Status Note
A: Agree on the problem Done, week 7 Four Cuts: WHO (youth 13 to 16 in the visiting group), WHERE (school hallways and buses), WHEN (after a public insult), HOW (a demand heard as disrespect)
D: Diverge wide Done, week 7 31 idea cards
O: One path Done, week 8 Two Doors plus LESS; said back by all four members
P: Prototype small Done, week 8 45-minute paper prototype; Stranger Test run with residents from another course
T: Try, Test, Tune Done, week 9 to 10 Pilot with resident audience week 9; live delivery week 10

Result and 3 Ws

Item Entry
Result Group average 2.6 of 4. Above the Fail Line, below the Result Number.
What Worked Role-play 1 (the bus seat) had every youth laughing and then quiet. Pocket card was kept by all.
What Wobbled Role-play 2 used prison language the youth did not know; the "need" step lost them.
What's Next (one change) Rewrite role-play 2 in school language, checked with the youth leader.

Verdict: ADJUST. Deliver again with the one change; same PROOF line; next visit per the Chaplain's schedule.

Limits (honest): One small group. The card measures understanding in the room, not behavior next week. The youth leader has offered to use the card again in 30 days; if approved, that becomes a retention check.

Approvals: Staff sponsor signature and date. Clinical and safety reviewer signature and date (required for any outside youth audience).

Part 6: How the Playbook Lives in the Meeting Rhythm

The TJP Meeting Rhythm has four meetings. Each one has a job to do with the Playbook. The rule of thumb: the faster the meeting, the smaller the change it can make.

Meeting How often, how long Playbook job Questions touched
Check-In Daily or per work block, 10 minutes, standing Reads the Playbook. Reads the One Big Thing aloud; each person says today's commitment Reads Q6 and Q7
Tactical Weekly, 60 minutes Updates Q7 commitments; checks progress on Q6 and Q8; reviews Project Pages Updates Q7; checks Q6, Q8
Strategic Monthly, 2 hours, one big topic Revises the season's plan and anchors when evidence says so; drafts Change Requests for leadership Revises Q5 to Q8
Horizon Review Quarterly, half day Revisits the foundation; asks whether purpose, behaviors, work, and people served still hold; prepares Board recommendations Revisits Q1 to Q4

What each meeting does with the Playbook, in detail

Question Check-In Tactical Strategic Horizon Review
Q1 Why are we here? Revisit; recommend to Board
Q2 How do we treat each other? Name one TRUST behavior Quick TRUST check at close Revisit; recommend to Board
Q3 What do we actually do? Revisit; recommend to Committee and Board
Q4 Who are we doing it for? Check Project Pages name a real person Revisit; recommend to Committee and Board
Q5 How will we win? Revise if evidence says so Review
Q6 One Big Thing Read aloud Check progress on supporting goals Revise supporting goals; propose next season Review season
Q7 Who does what, by when? Say today's task Update all commitments Revise standing roles Review
Q8 How will we know it worked? Check PROOF line results Revise program measures Review whole-program evidence

How Playbook changes are logged

Every change to the Playbook, however small, gets a line in the Playbook Change Log, kept by the Playbook keeper at the front of the master Playbook. The version number tells anyone at a glance how big the change was.

Version numbers:

Change Version jump Example Approved by
Q1 to Q4 (foundation) Whole number v1.4 to v2.0 Board of Volunteers (Q1, Q2); Committee after consulting Board (Q3, Q4)
Q5 to Q8 (season plan) Decimal v1.3 to v1.4 Interdepartmental Committee
New or closed Project Page, typo fixes No version change; noted in log v1.4 (log entry only) Staff facilitator

Sample change log:

Version Date What changed Proposed by Approved by
v1.0 (launch date) First approved Playbook Drafting team Board (Q1, Q2); Committee (Q3 to Q8)
v1.1 (date) Q7: Decision Log keeper role rotated Tactical Interdepartmental Committee
v1.2 (date) Q6: Supporting goal 3 narrowed to one dorm Strategic Interdepartmental Committee
v2.0 (date) Q4: added a new group served Horizon Review Committee after consulting Board; SCDC Division informed

Rules for changes:

  1. Every change starts as a Playbook Change Request (Worksheet 7). Anyone can write one.
  2. The request goes to the right meeting: Tactical for Q7, Strategic for Q5 to Q8, Horizon Review for Q1 to Q4.
  3. The meeting recommends; the right leadership level approves.
  4. Once approved, the Playbook keeper updates the master copy, the posted copies, and the change log within one week.
  5. Every approved change appears in the next Monthly Report.
  6. Old versions are kept, never thrown away. A dated, printed copy of each version goes in the Playbook binder.

The Playbook Life Cycle

This is the loop that ties meetings, the Playbook, and leadership together. It runs every month.

Step What happens Who Output
1. Meeting Check-Ins, Tacticals, and Strategics do their work Residents and staff facilitators Decisions and commitments spoken aloud
2. Decision Log Every decision and commitment written down with a name and date Decision Log keeper A dated log, read back at the end of each meeting
3. Playbook update Commitments update Q7; approved Change Requests update other questions; Project Pages updated Playbook keeper, with approval at the right level Current Playbook with a change log entry
4. Monthly Report Playbook sections feed the report (see next table) Program lead (staff) signs off The TJP Monthly Report to all three levels
5. Leadership feedback Leadership reads, asks questions, approves or declines requests SCDC Division, Board, Committee Written or spoken feedback, approvals
6. Next Strategic meeting Feedback is the first agenda item; the loop starts again Strategic facilitator Revised plans, new Change Requests

How the Playbook feeds The TJP Monthly Report

The Monthly Report should not require anyone to invent anything. If the Playbook is current, most of the report is already written.

Monthly Report section Comes from Playbook question
Who we are (one line, repeated every month) Vision and mission Q1
The One Big Thing: progress this month Supporting goals, status Q6
Commitments kept and missed Tactical Decision Log, Worksheet 4 Q7
Proof this month PROOF line results, Evidence Workbook Q8
Projects this month Project Pages opened, piloted, closed, with verdicts Q3, Q4, Q8
Changes to the Playbook Change log Any
Requests for leadership Pending Change Requests Any

Part 7: The Clarity Check

The Clarity Check tells you whether the Playbook is living in people's heads or only on the wall. It takes about 25 minutes. Use it at orientation, at every Horizon Review, and any time a team feels confused.

How to run it

  1. Hand out blank Clarity Check sheets (Worksheet 6). No Playbook on the table. Cover the posters if you need to.
  2. Each person answers all Eight Questions in one sentence, from memory. Eight minutes. Silent. No looking at a neighbor.
  3. Uncover the Playbook. Each person scores their own sheet against the current Playbook answers using the scale below. Five minutes.
  4. Compare. Go around the room, question by question. Read a few answers aloud (voluntary). Where are we saying the same thing? Where are we far apart? Ten minutes.
  5. Record the team score and pick one question the team will work on before the next check.

Scoring scale (per question)

Score Meaning
2 Same meaning as the Playbook, in your own words
1 Close, but missing a key part or adding something that is not there
0 Blank, or a different answer

Maximum per person: 16.

What the scores mean

Individual score Reading
14 to 16 Clear. You could explain TJP to a judge or a new resident today.
10 to 13 Mostly clear. Review the questions you missed.
6 to 9 Foggy. Pair up with someone who scored high and walk through the Playbook.
0 to 5 Not yet. Normal for the first week of orientation; not normal after a season.

Team reading: Add up the scores for each question across the room and divide by the number of people. Any question with a team average below 1.5 is a clarity gap. The fix is almost never "people should study harder." Per Deming, blame the process, not the person: the answer may be too long, the poster may be in the wrong place, or the Check-In may have stopped reading it. Fix the process.

Part 8: What Could Go Wrong

Every good tool can be misused. Here are the most likely ways the Playbook fails, and what to do about each.

What could go wrong What it looks like What to do
The binder problem The Playbook is written once and never opened Check-In reads Q6 aloud every day; Tactical updates Q7 every week. If a meeting did not touch the Playbook, it did not follow the Rhythm.
Word drift Posters say one thing, the master file another Playbook keeper updates posted copies within one week of any change; version number printed on every poster
Too many "One Big Things" The season has three rallying cries Committee approves exactly one. Everything else is a supporting goal, a standing responsibility, or "not this season."
Moving the goalposts A PROOF line target changes after the pilot Approved Result Numbers and Fail Lines are locked. Log any attempt to change them.
Confusion about authority Residents believe a Tactical vote changed the purpose Post the authority table (Part 4) next to the Playbook. Tactical never changes Q1 to Q4.
Slogans instead of behavior TRUST is recited but not practiced Close every Tactical with a one-minute TRUST check: "Which behavior did we do well? Which did we miss?"
Overload The Playbook grows to 40 pages Program-level Playbook stays under about 6 pages. Everything else goes on Project Pages or in other TJP documents.
Clinical boundary creep A project starts drifting into therapy or into contact with people harmed Q4 "not for" lines and the clinical and safety reviewer's signature on every Project Page with trauma-adjacent content

Part 9: Why TJP Must Exist

Why this Playbook, specifically, is part of the case

A skeptic will ask a fair question: "Isn't this just another prison program with good intentions?" The Playbook is our answer, and it is a strong one:

A skeptic asks The Playbook answers
"Do they even know what they're trying to do?" Every resident can say the Eight Questions from memory, and we check (the Clarity Check).
"Who is running this?" Three levels of leadership, written into every question's approval rule. Not resident-led.
"How do we know it works?" Question 8. PROOF lines written before building, Fail Lines honored, verdicts reported, including ABANDON.
"Won't it just stay inside the fence?" Question 4 names real people outside the fence. The CARRIED anchor demands tools others can use without us.
"Will it last past the founders?" The Playbook, Project Pages, and change log are a written memory. Cohort B inherits Cohort A's library.

Part 10: Signage for the Dorm, the Think Tank, and the Task Force

Sign Where What it says Size and notes
The Eight Questions Dorm common area, Think Tank, Task Force The eight questions with the memory chant: Why, How, What, Whom. Win, Now, Who, Know. Two letter sheets side by side, or one sheet in large type
Our Answers Think Tank wall The current one-line answer to each of the Eight Questions Updated with each version; version number printed
The One Big Thing banner Above the Task Force door THIS SEASON'S ONE BIG THING: Launch Cohort A and prove the model Several sheets taped in a row; changes only when the season changes
Supporting Goals scoreboard Task Force wall The 3 or 4 supporting goals with a simple status: Not started / Moving / Done Laminated; status written in dry-erase marker at Tactical
TRUST Every meeting space The five core behaviors One per table if possible
Close, Checked, Carried Task Force The Three Cs with one line each Put near the prototype table
No Numbers, No Build Task Force, by the supply shelf "Nobody builds until the PROOF line is written." Small and blunt
Project Wall Task Force Current Project Pages pinned up, one per project Retire closed pages into the binder
Who Decides Next to the Playbook binder The authority table in short form: Residents propose. Committee approves Q3 to Q8. Board guards Q1 and Q2. SCDC Division is informed. Prevents confusion about authority
Rhythm card Meeting table "Check-In reads. Tactical updates. Strategic revises. Horizon Review revisits." Label-maker strip on each table edge

Part 11: Getting Started: The First 30 Days

A Playbook starts as a draft and becomes real through use. Here is a simple path from this document to a living Playbook.

When What Who
Week 1 Drafting team (residents and a staff facilitator) reads this document and marks up the draft answers in Part 4 Drafting team
Week 1 Interdepartmental Committee reviews the draft answers to Q3 to Q8 Committee
Week 2 Board of Volunteers reviews Q1 and Q2 and comments on Q3 and Q4 Board
Week 2 First Clarity Check with the drafting team (expect low scores; that is the baseline) Facilitator
Week 3 Approved answers become Playbook v1.0; change log started; signs printed and approved Playbook keeper
Week 3 Check-Ins begin reading the One Big Thing aloud All facilitators
Week 4 First Tactical updates Q7 commitments on Worksheet 4 Tactical facilitator
Week 4 First Project Pages opened for any ADOPT projects underway Project leads
End of month First Monthly Report includes the Playbook v1.0 summary Program lead (staff)

Worksheet 1: The Eight Questions Master Sheet

Playbook version: v Date: Approved by:

Write each answer in one or two sentences. If you cannot fit it, it is not clear yet.

# Question Our answer (plain words) Guarded or approved by
1 Why are we here? Board of Volunteers
2 How do we treat each other? Board of Volunteers
3 What do we actually do? Committee, Board consulted
4 Who are we doing it for? Committee, Board consulted
5 How will we win? Interdepartmental Committee
6 What matters most right now? Interdepartmental Committee
7 Who does what, by when? Interdepartmental Committee
8 How will we know it worked? Committee, Board consulted

Say-it-back check: Can every person in the room say the One Big Thing from memory? Yes No

One-breath test: Read your Q1 answer aloud. Did it take more than one breath? Yes No

Signatures (drafting team):


Worksheet 2: Core Behaviors

Use this to review TRUST, sort values into the four kinds, and check whether we live what we say.

Part A: Sort our values. List everything people say we value. Put each in one column.

Core (who we truly are) Permission to play (required) Aspirational (not yet) Accidental (crept in)

Part B: Behavior check. For each TRUST behavior, write one example from the past two weeks where we did it, and one where we missed it.

Behavior We did it when... We missed it when...
Tell it early
Rank the idea, not the person
Unfinished is allowed
Say it in the room
Take the task

Part C: The cost test. Which core behavior would we keep even if it cost us something (time, comfort, looking good)? Explain.



Part D: Proposed change (if any). Use Worksheet 7 to send it to the Board of Volunteers through the Interdepartmental Committee.


Worksheet 3: The One Big Thing

Lencioni's thematic goal in plain words: one rallying cry for one season (six to twelve months), three to five supporting goals, and the standing responsibilities that never go away.

Season: from to

THE ONE BIG THING (one sentence):


Test it: Is it one thing? Has an end date? Could every resident and staff member say it?

Supporting goals (temporary pieces that make the One Big Thing true):

# Supporting goal What "done" looks like PROOF line attached? Owner
1 Yes / No
2 Yes / No
3 Yes / No
4 Yes / No
5 Yes / No

Standing responsibilities (every season, no matter what):

# Standing responsibility Owner How we check it
1
2
3
4
5
6

"Not this season" list (good ideas we are choosing to wait on):



Approved by Interdepartmental Committee: Date:

Worksheet 4: Who Does What by When

Filled in during Tactical meetings. Read back at the end of every meeting. One name, one date, one proof.

Team or meeting: Week of: Facilitator:

# Task (one thing) Who (one name) By when Done = (how we can tell)
1
2
3
4
5
6
7
8
9
10

Last week's commitments review:

# Task Done / Not done If not done: what got in the way (blame the process)

Commitments kept this week: of

Staff facilitator initials:

Worksheet 5: Project Page Template

Project name: Playbook version: v

Course or Keystone: Channel (1, 2, 3, or 4): Space: Think Tank / Task Force

Project lead: Staff sponsor:

Question (project size) Our answer
1. Why does this project exist?
2. TRUST charter signed? Extra rules?
3. What exactly are we building? (one sentence)
4. One named real person it is for. Who is it NOT for?
5. Which anchor does it show most? (Close, Checked, Carried)
6. Current ADOPT step and next thing due
7. Team, roles, next three commitments

8. PROOF line (written BEFORE building):

Part Entry
Problem Number (baseline)
Result Number (win)
Observer (outside the team)
On this date
Fail Line

ADOPT status: A D O P T (write the date each step was completed)

Result: What Worked:

What Wobbled: What's Next (one change):

Verdict (circle one): ADOPT / ADJUST / ABANDON

Honest limits:

Staff sponsor signature and date:

Clinical and safety reviewer (required for trauma-adjacent content or outside audiences):

Worksheet 6: The Clarity Check

Name (optional): Date: Playbook version: v

Answer each question in one sentence, from memory. Do not look at the posters. Then score yourself: 2 = same meaning, 1 = close, 0 = blank or different.

# Question My one-sentence answer Score
1 Why are we here?
2 How do we treat each other?
3 What do we actually do?
4 Who are we doing it for?
5 How will we win?
6 What matters most right now?
7 Who does what, by when? (name your own role)
8 How will we know it worked?

My total: of 16

Team tally (facilitator):

Question Team total Number of people Team average (below 1.5 = gap)
Q1
Q2
Q3
Q4
Q5
Q6
Q7
Q8

The one question we will work on before the next check: Process fix:

Worksheet 7: Playbook Change Request

Anyone can propose a change. The right leadership level decides. Attach extra pages if needed.

Proposed by: Date: Current version: v

Which question? (circle) 1 2 3 4 5 6 7 8 or Project Page:

Current answer (copy it exactly):


Proposed new answer:



Why change it? What evidence do we have? (a PROOF result, a 3 Ws debrief, a Clarity Check gap, leadership feedback)



Which TRUST behavior or anchor does this protect or strengthen?

Routing (facilitator completes):

Step Meeting or level Date Result
Discussed at Tactical (Q7) / Strategic (Q5 to Q8) / Horizon Review (Q1 to Q4) Recommend / Do not recommend
Approved by Interdepartmental Committee Approved / Declined / Returned
Approved by (Q1, Q2 required; Q3, Q4, Q8 consulted) Board of Volunteers Approved / Declined / Comment
Informed SCDC Division (via Monthly Report) Month reported:

New version number: v Change log updated by: Posted copies updated on:

Further Study

  • Patrick Lencioni, The Advantage: Why Organizational Health Trumps Everything Else in Business (Jossey-Bass, 2012). The source of the six critical questions, the four kinds of values, strategic anchors, the thematic goal, and the "playbook." Read the section on creating clarity closely; skim the business examples. Ask for it through the institutional library or a partner donation.
  • Patrick Lencioni, The Five Dysfunctions of a Team (Jossey-Bass, 2002). A short story about a leadership team that cannot trust each other. The foundation for our TRUST behaviors. Excellent for group reading; the story format works well for any reading level.
  • Patrick Lencioni, Death by Meeting (Jossey-Bass, 2004). The source of the meeting types behind the TJP Meeting Rhythm. Read alongside the TJP Meeting Rhythm document.
  • W. Edwards Deming, Out of the Crisis (MIT Press). Deming's case that most problems come from the system, not the worker. The idea behind "blame the process, not the person." Dense; read chapter summaries first.
  • W. Edwards Deming, The New Economics for Industry, Government, Education (MIT Press). Includes the Plan, Do, Study, Act cycle, the thinking behind Question 8 and the One Change Rule.
  • Mary Walton, The Deming Management Method (Perigee). The friendliest introduction to Deming. Start here before Out of the Crisis.
  • Gerald Langley and colleagues, The Improvement Guide (Jossey-Bass). Built around three questions that sit close to our Question 8: What are we trying to accomplish? How will we know a change is an improvement? What change can we make that will result in improvement?
  • Atul Gawande, The Checklist Manifesto (Metropolitan Books, 2009). Why short written tools save lives in complex work. A good argument for keeping the Playbook short.
  • Amy Edmondson, The Fearless Organization (Wiley, 2018). On psychological safety: why people speak up or stay silent. Supports "Tell it early" and "Say it in the room."
  • Chip Heath and Dan Heath, Made to Stick (Random House, 2007). Why some ideas are remembered and others are forgotten. Use it when writing Playbook answers and signs.
  • Sam Kaner and colleagues, Facilitator's Guide to Participatory Decision-Making (Jossey-Bass). The best practical book for anyone facilitating Tactical and Strategic meetings.
  • Marshall Rosenberg, Nonviolent Communication: A Language of Life (PuddleDancer Press). Background for the Course 11 example Project Page.
  • The Table Group (Lencioni's firm), tablegroup.com. Free summaries and tools on organizational health. Staff or partners can print relevant pages; residents have no internet access.

Sources

  • Lencioni, Patrick. The Advantage: Why Organizational Health Trumps Everything Else in Business. San Francisco: Jossey-Bass, 2012. (Six critical questions, four disciplines, value types, strategic anchors, thematic goal, playbook.)
  • Lencioni, Patrick. The Five Dysfunctions of a Team: A Leadership Fable. San Francisco: Jossey-Bass, 2002.
  • Lencioni, Patrick. Death by Meeting: A Leadership Fable. San Francisco: Jossey-Bass, 2004.
  • Texas Tech University Health Sciences Center, "Lencioni Thematic Goal Model" (summary of thematic goal, defining objectives, standard operating objectives): https://www.ttuhsc.edu/president/documents/lencioni/lencioni-thematic-goal-model.pdf
  • Consult Clarity, "Thematic Goal: Lencioni Guide" (summary noting a three-to-twelve-month thematic goal window): https://www.consultclarity.org/post/thematic-goal-lencioni-guide
  • Deming, W. Edwards. Out of the Crisis. Cambridge, MA: MIT Press (originally MIT Center for Advanced Engineering Study, 1982/1986).
  • Deming, W. Edwards. The New Economics for Industry, Government, Education. Cambridge, MA: MIT Press, 1993.
  • Walton, Mary. The Deming Management Method. New York: Perigee, 1986.
  • Langley, Gerald J., et al. The Improvement Guide: A Practical Approach to Enhancing Organizational Performance. 2nd ed. San Francisco: Jossey-Bass, 2009.
  • Gawande, Atul. The Checklist Manifesto. New York: Metropolitan Books, 2009.
  • Edmondson, Amy C. The Fearless Organization. Hoboken, NJ: Wiley, 2018.
  • Heath, Chip, and Dan Heath. Made to Stick. New York: Random House, 2007.
  • TJP, The ADOPT Model: Task Force Workshop Series (internal). Source of ADOPT, TRUST, PROOF, LESS, the 3 Ws, and the doctrine quoted throughout.